Thursday, January 1, 2009

Applying the Software Development Life Cycle in a Web 2.0 Context

For the past 20 years or so, the "Software Development Life Cycle" has been the process for defining, designing, constructing, and deploying applications. Various methodologies for building software have evolved over time, e.g. Waterfall methods, spiral method, rational unified process, extreme programming, etc. that prescribe different processes for development of software. However, all of them regardless of methodology have some common basic assumptions that I believe have now changed in a Web 2.0 world. These basic assumptions are as follows:
  • Software development involves engineering code artifacts that implement some sort of requirements specification. In waterfall methods, the requirements are defined up front. In more iterative or agile methods the requirements are iterated through cycles. But in all these methodologies, the primary purpose of developing software is custom developing software based on these requirements.
  • The "Application" is a deployable, atomic set of artifacts that can be deployed through a series of steps to a particular environment. The "Application" is used by a client that engages with the application. Traditionally, the user of the application does not get to change or redefine the application except through very rigidly defined configuration mechanisms.
  • Software development historically has required a large amount of testing in order to ensure that a) there are no bugs in the software and b) the software complies with requirements. Software is tested before it is released to users.
  • Software development is done by a team of experts that understand how the software works, how it can be modified and how to manage the overall development cycle. Software developers and end-users of the software do not really collaborate on building the software - end-users consume the software as it is released.

In the media, the old traditional form of Push media is being replaced by user generated content, collaboration, and Pull from users. The distinction between producers and consumers has been blurred so that online news hubs become more like information radiators than centralized distribution points.

Software development, in my opinion, is going through a similar revolution to the mainstream media. It is happening in a slower fashion because the software "industrial complex" is still highly engaged in generating software through the traditional means and because it generally works especially for large enterprise applications. However, in certain spaces and where consumers of software are engaged, the traditional model of a software development team pushing out software that is consumed by a user is starting to break down.

In order to make my point, let me give you a few examples:

  • Software applications can be created via "Mash-ups" that allow end-users to combine existing application components into new applications.
  • Portal applications such as Microsoft SharePoint are blurring the distinction between application components and user modifiable objects. For example, a Document Library in SharePoint part of an application or is it a user object?
  • Cloud based services are now being released and combined in a variety of different methods.
  • Clients such as Microsoft Office 2007 are now sophisticated enough to serve as application development platforms in themselves. For example, a traditional "reporting application" can now be built quite easily using Excel 2007 pointing at a data warehouse.

In addition, users expectations have changed dramatically has Web 2.0 has encouraged them to collaborate, blog, share information and build their own customized spaces. When a 12 year old can over night create their own blog, organize a protest online, share pictures, integrate Google Maps, and add dozens of widgets to their personalized home page, the idea of waiting 3 months for the next software "release" by an ivory tower software team quaint at best and non-responsive at worst.

In the corporate world, IT departments are struggling with this challenge in application spaces that encourage collaboration and customization with end-users. Business users do not want to wait 3 months for a static report - they want a drill down BI tool that allows them to build their own "application" (whatever that now means). In the portal world, IT departments are struggling with how much control they provide their end-users to redefine the underlying structure of meta-data, document types, user profiles, etc. In the SharePoint world for example, its difficult to tell where the "application" stops and user generated content begins because the platform is designed to encourage modification and collaboration by office workers.

On the other hand, the risks and challenges that the software development life cycle has helped solve over the past 20 years have not disappeared because we have moved from a code centric, monolithic, and IT controlled software development cycle to a collaborative, distributed and user centric model:

  • How are changes "deployed" when an office user can simply make a change in production to a content type, a work flow, a user profile definition?
  • How are the impacts of changes "tested"? For example, I can change the layout of my blog, add widgets to it, etc. but can I really test those changes before they become visible to the world (in my blog software, I have the ability to "preview" which is sort of a test but not quite the same as a proper QA environment)?
  • How are application componentized when changes are done by potentially hundreds of users working collaboratively? What constitutes a "release"? For example, on Facebook, I create a Facebook Page that has a set of content, some groups, some events, etc. but there is no way to package these changes up into a deployable unit.
  • How are changes versioned and backed-up? I have this problem with my blog for example. If I make changes to my blog "application" through changing the layout, modifying the HTML, etc. there is no easy way for me to preserve these changes as a version. I cannot roll-back to a previous version either.

Software development methodologies have good answers to these challenges and over the past 20 years have matured to address these issues through test driven development, source code control, build management, project management, quality assurance, etc.

As an industry, we have a similar challenge to the mainstream media - how do we adapt these worth while processes so that we can continue to deliver high quality software to our customers while adapting to an environment where our users are going to be creating software with us in a highly collaborative manner? How do we recreate the software development life cycle for a Web 2.0 world?

Friday, September 21, 2007

Software Development Metaphors

There are lots of discussions on Software Development "methodologies". They are codified sets of practices on how to do software development "correctly". When you get down to the root of each of these methodologies, the root of all of them is a metaphor. Before you adopt a methodology such as XP, Scrum, RUP, Software Factory, etc. you should really ask yourself what metaphor you believe your particular software development practices fit into and what metaphors fit your particular organization's culture. If you start there instead of at the "here is my fancy new toolbox of processes" then adoption will be higher.

So here is a list of popular metaphors used to explain the practice of creating software...

The Traditional Software Development Metaphors

Software Development as Factory
  • Heavy emphasis on frameworks (assembly line) and components (widgets)
  • Use in large scale development projects (hundreds of developers) or highly distributed projects (outsourced)
  • Highly centralized control of processes, tools, etc.

Software Development as Engineering

  • Heavy focus on estimation techniques
  • Fixes made in planning are less expensive than after “construction” has started.
  • Highest project management priority is being “in control”.
  • Software development as a science, e.g. objective, measurable.
  • Belief that Software Development is an immature or imprecise version of engineering.

Software Development as Model/Architecture

  • Architect as “GOD”
  • Code is simply implementation of a model
  • If the software doesn’t work, either the model is wrong or the code doesn’t implement the model properly.
  • Tooling can automatically generate application from the model.
  • Software models a business, a process, etc. in design. Goal of software is to accurately reflect real life processes.
  • Need specialized modeling languages, expertise, and tools

Software Development as Workflow/Process

  • Projects as repeatable processes.
  • Workflow is defined up front, and people are compartmentalized.
  • Emphasis on distribution, encapsulation and hand-off.
  • Project managers are process champions – they make sure the rules are followed.

These metaphors have formed the bedrock of software development. They represent the traditional way of viewing software development as well as project management in general. They have enabled a whole toolbox of techniques, tools and templates for managing projects and software development.

The Radical Software Development Metaphors

These metaphors have become in vogue thanks to various agile methodologies, reactions against the traditional view of software and frankly a lot of failures for the traditional metaphors to come to grips with the complexities of creating software.

Software Development as Craft/Voodoo/Martial Art

  • Focus on simplicity, elegance, and craftsmanship
  • Toolbox approach
  • Apprentice / Master / Guru model
  • Software is highly dependent on people
  • Software “Design” provides guide to picking solutions

Software Development as Game Playing

  • Games are processes without the prescription
  • Games can be open or closed, cooperative or competitive
  • Rules of the game are enforced, but outcome is unknown
  • Games also include collaborative activities such as sports, playing music, dance, etc.

Software Development as Book Writing/Composition/Poetry

  • Iteration, drafts, reviews, etc.
  • Focus on creativity within an established structure.
  • Objective is known, but product is not well defined.
  • Challenges in forcing creative process into rigid scope, time lines and budget are recognized.

Software Development as Learning/Experiment/Invention

  • Modeling in software is about learning
  • Documentation, requirements gathering is a means to collective learning
  • Focus on establishment of common language
  • Prototyping, experiment, measuring as a way to learn

Which one fits your culture, your organization needs, and your skill set? If you're a start-up company, then the software factory metaphor might not be the best fit. However, if you're building printer drivers with third party outsourcers in India, then perhaps it is the right model.

If you start with basic metaphors, the toolbox and methodologies such as RUP, XP, Scrum, Waterfall, etc. start to make more sense - they're expressions of the underlying metaphor. In addition, if you want to evangelize a new software development methodology (for example, those who are trying to evangelize the use of XP in a traditional RUP organization) starting with a discussion around metaphors and basic understanding of software development might help the discussion, especially with non-technical users.

One last suggestion - this discussion is a great interview topic for Project Managers. If you want to hire an "Agile" PM, then start the interview with the list of metaphors and ask them which one they believe fits their style of working. If they pick one metaphor, then get them to explain how their PM toolbox (GANTT charts, risk matrices, status reports, etc.) fit into the metaphor. The traditional toolbox can be used in an agile context if the underlying metaphor is right - there are ways to use MS Project even if you believe that Software Development is more like writing a book then building a bridge.

Monday, August 13, 2007

Project Planning in an Agile Project

Tate Stuntz has an interesting post on his blog arguing that Project Plans are obsolete and hard to maintain when doing Agile projects. In my experience on agile projects, project planning and Gantt chart making definitely has to change, but there are still ways I think you can make MS Project and Gantt charts work for you in an agile context. Here are my recommendations based on my experience:
  • Learn to use MS Project efficiently (see my previous post for recommendations). I've seen PM's take 2 weeks to build a project plan - if this is you then trying to work this way in a 2 week iteration cycle means you're not moving fast enough. You have to be at the point where you could re-boot your project plan in a matter of hours so that you can adjust quickly.
  • Use MS Project for planning and not for tracking. If you're working with short iteration cycles, you'll see improved tracking by simply management by walking around. In addition, measuring project velocity is more valuable than percentage complete since in an Agile project the finish line is not always defined.
  • Use a project plan for iteration planning at a macro-level and not for iteration tracking within an iteration cycle. What I like doing is maintaining a project plan with a simple list of user stories in each 2 week iteration. That allows me to track dependencies between user stories pretty easily. At review time at the end of an iteration, we discuss the next iteration with our stakeholders and reset expectations by re-forecasting the plan (which takes no more than an hour of work). That gives stakeholders a good understanding of what we currently see as in and out of scope and when features may be coming up. This is highly valuable and I find is critical for buy in for stakeholders - if the response from the team is simply, "we can only see to the end of the next iteration cycle" this tends to make business users very nervous.
  • If you need pretty Gantt charts, one of my favourite methods is to use Visio - it provides pretty Gantt charts for presentations without the fuss of Project.
  • I tend to use the whole team as a big pool for planning iterations. This gets you out of the micro-detail of having to assign one user story to one person, another user story to another person and so on. If I have 4-5 developers on a team, that gives me 70 hours x 4-5 developers for a total iteration budget of 280-350 hours. I can then do a good estimate of each user story that includes planning, development and QA with the team. We simply add up a bunch of these stories into the budget and that becomes the iteration. The way to do this in MS Project is to take your steps and instead of assigning individuals assigned to each task and running them in parallel try simply taking a generic role of "developer" and assigning them at 500% to every task in sequence. You can then tell how much time you're going to spend across the entire team without having to fuss with all the micro-dependencies.
  • For preliminary planning, use low-tech Gantt chart tools such as whiteboards, post-it notes, etc. I can create a Gantt chart without MS Project using a white board, some markers and post-it notes. This works great without the overhead of the tooling getting in the way. If you want to preserve it, simply take a digital photo of it and store the picture.

I think if you follow some of these techniques as a Project Manager, you can still sleep at night without feeling completely out of control and yet move faster and leaner. In addition, you can use project planning to help sell the concept of Agile to stakeholders who aren't as comfortable with the XP style of development and give them the comfort of a traditional project plan without locking yourself into the traditional bureaucratic approach to Project Management.

Monday, July 23, 2007

Agile Tools for .NET Part 2

This is a follow up to my previous post on Agile Tools for .NET. I got to the office and I noticed a few more tools that I missed in my previous post.

Confluence

Atlassian's professional WIKI solution, it works great with JIRA and provides a really nice WIKI solution. For those who want to travel light with documentation, WIKI's provide a nice fit for technical documentation, build documentation, internal designs, etc. as they easily accomodate rapid changes, are completely web based and allow for automatic version tracking.

Data Dictionary Creator

One of the principles of Agile is make your code self-documenting. What about making your database self-documenting? You can do this in SQL 2005 in T-SQL by adding meta-data and descriptions to each field in your database. The Data Dictionary Creator tool does the same thing through a nice GUI and allows for export and import of the documentation. You can then document your database and store the meta-data in source safe for version control and safe keeping. In addition, you can export the descriptions to an excel file for instant documentation!

Wisdom Screen Hunter

Not really a development tool, but how many times have you been creating documents and wanted a quick screen capture? Forget using the PrntScrn and fiddling in paint - use this tool. Its free and allows you to capture any arbitrary rectangular area as well as any active window. Simply hit F6 and off you go.

Sunday, July 22, 2007

Agile Tools for .NET

The following is a list of tools for doing agile based development with Microsoft .NET. There are quite a few tools out there that will accelerate your use of continuous integration, test driven development, source control integration, etc.

I have used all these tools - most I use on a daily basis. They are highly recommend and most are either low cost or free.

JIRA

Best tool for task management. For more details see my review of JIRA from a previous post. It's bugzilla on steroids and is much better and simpler than most windows based tools. It's java based, but there is still no reason not to use it for .NET based development.

NUNIT

NUnit is an implementation of the XUNIT framework for .NET. It allows you to create unit test classes that can be run by either a GUI or console application. NUnit will also integrate into your build process so that on each build, you run through your automated tests to make sure they still pass.

NANT

NANT is a port of the ANT build tool from Java. NANT allows for build scripts based on simple XML files. NANT can do things such as compile code, deploy assemblies, manage directories, start and stop processes, run executables, etc.

NCover

NCover is a code coverage tool for .NET. It will instrument your assemblies when they are built to analyze each line of code in your assembly and whether it was actually executed (exercised). If you combine this with NUnit, you can then tell how much your unit tests actually go through every path of code.

dotTrace or Ants Profiler

Either tool will do, but personally I like Ants Profiler better and you can get it as a bundle with Ants Loader for cheaper. Both tools do the same thing - they profile either memory or performance data for your executing code. You can profile an ASP.NET web site, a Winform application or a Windows Service. What you will get in the case of memory profiling is the ability to snapshot at any point of execution a picture of what is in memory. This can help with objects not getting garbage collected properly or where you're running into memory issues. For performance profiling, the tool will tell you the amount of time each line of code took to execute. This can be useful for performance testing in that you can see the breakdown of time for a method to isolate the particular lines of code that are taking the longest.

Cruise Control .NET

Cruise Control is a port of the java application of the same name. It is a continuous integration server which will fire a build on every check into your source code repository. It can run either a NANT script or an MSBuild script or simply tell Visual Studio 2005 to do a build. It then stores the status of each build in a little intranet site that you can monitor and it can email you notifications as well. This provides an automated way to integrate code and test to make sure it builds and passes all your unit tests.

My Generation

My Generation is a code generator. It ships with a number of templates for generating O/R mapping code for frameworks such as Gentle, NHibernate, DAAB, etc.

TestDriven .NET

This is one of my favourite tools. It allows you to integrate your unit testing right into studio. Want to run one of your NUnit Tests? Just right click on the test code and up comes a Run with option that you can then run with the debugger, NCover, NUnit, etc. The one I use most is run with Debugger as it means you can step through the code hit by each of your unit tests.

ANKH

Ankh is a subversion add-in for Visual Studio 2005. For those who are using subversion as your source code control system (and I would recommend subversion in general over Visual Source Safe) it allows you to update and commit code from the solution explorer window. My only problem with this tool is that its quite slow especially if you have large projects, so you may find it easier to check in with external tools after a while. But for those who are just getting used to subversion, its a great first step.

Thursday, July 19, 2007

Getting to the Finish Line in an Agile Project


One of the great potentials of Agile software development is flexibility in changing requirements. We currently use agile methodologies and have scheduled 2 week iterations. We have show and tells with stakeholders every two weeks where we show them where things are at and gather new user stories, functionality changes and other feedback to plan for the next iteration.

One of the challenges we have found with this approach is that the project quickly turns into perpetual development. One of the advantages of a traditional waterfall model is a solid arc in development and a very specific deliverable - you have a good definition of when you're done. In an environment where the requirements evolve, the time lines are fluid and the stakeholders are not that experienced at software projects we are finding that this means that the project never seems to end! Every two week iteration, stakeholders simply pile on new requirements and the launch date drifts away.

In a consulting environment, this isn't such a bad thing if you're on a time and materials engagement - the client simply gets to spend their money as long as they want. But in an internal development team, this poses a challenge because most stakeholders aren't really aware of how much money they are spending and they simply keep monopolizing the team. In the meantime, there are other projects or priorities queueing up in the background.

Based on what we have found works, here are some practical recommendations on how to combat this problem:
  • Establish clear business objectives and as many solid functional requirements as possible. There is a happy medium between XP style iterative programming and a rigid waterfall model. Try to put some acceptance criteria that can be measured so that the entire team has a common understanding of the target.
  • Remember the law of triple constraints - of cost, resources, and time changing any of these impacts the others. Make sure that stakeholders are aware of the real cost (even if it is an internal cost) through an internal budgeting model. In our organization, we have a shared cost model in IT but we can allocated the shared cost to any department we choose. In cases where we see departments monopolizing our time we can allocate more cost to them. This gives internal stakeholders an incentive to prioritize and conserve resources.
  • Make stakeholders compete with each other. This is pure politics but it works. The easiest way to stop a project is to simply tell another stakeholder that they're waiting in the queue behind someone else. There will be a pretty quick meeting between stakeholders where one will start to put a lot of pressure on the other to get their project done quickly or to get out of line altogether.
  • Time box and resource constraint the project explicitly. We do this quite a bit with reporting needs which seem to continually evolve ad nauseum. When we start these types of projects, we establish a budget of 2-3 iterations and that's the budget. The requirements can evolve but there continues to be pressure on the stakeholder to get it right the first time or else lose their window.
  • Always have a phased approach with Phase 2 and 3 already planned in Phase 1. This gives the stakeholder the ability to still feel they're going to get a change at some point but perhaps can live with launching without it.
  • Be vigilant and communicate often about what's currently in and out of scope. I'm not sure whether stakeholders intentionally play dumb or whether people simply don't hear bad news but I've experienced several times the case where three meetings in a row we hear questions about a feature that we've already ruled out of scope and there is genuine surprise from the stakeholder that they're not getting a particular feature even if its been already discussed, documented, etc.
  • Have really strong leaders in QA. QA Leads, especially in the latter stages of projects, become crucial at communicating and organizing priorities. A great QA Lead can manage stakeholders on a daily bug review meeting and can handle the constant re-negotiation of last minute feature requests, low priority bug fixes, etc. and keep the process moving towards launch. If the project loses velocity during the stage it opens the door to ever increasing scope change. If the project has high velocity then everyone on the team feels like they better prioritize because time is running out and the project is going to launch without them. This helps crystallize priorities and puts good pressure on stakeholders to commit to the minimum work required to launch.

I've been in projects where we sat at 90% for 5 months because we kept stalling as we closed in on the finish line. In addition, I've been on projects with internal teams where the stakeholders simply got used to having a software team at their disposal week after week and their was never any pressure to launch anything or to stop working.

As a project manager, your goal is to launch - 90% complete is really 0% complete especially if it's still just running in development or still buggy in test.

Wednesday, July 4, 2007

Implementing an Agile Change Control Process

What is Change Control?

Change Control traditionally is a project management process for managing change. The typical method for managing change in a classic PMP project is a Change Control form that is filled out containing the scope of the change, impact to the project, etc. This is then approved and incorporated into the master project plan, charter, etc.



In addition, Change Control processes are used by operations departments to manage the deployment and promotion of code from one environment to another. The Change Control Form provides the documentation for an operations team to deploy, operate and monitor the change.

Change Control and Agile

This traditional view of Change Control is at odds with Agile methodologies for the following reasons:

1. Change is viewed as a non-typical event, e.g. the project was running smoothly until someone threw a change into the project. Agile projects by definition are based on the assumption that changes are typical events and aren't special.

2. Change requests are simply Waterfall designs in miniature. Requirements for the change must be documented up front and analyzed. Stakeholders must approve of changes before they are made with the assumption that requirements, scope, risk, and design can be formally documented ahead of making a code change.

3. Traditional Change Control processes are document heavy. The process is designed as much to capture and document change as it is to make effective decisions. Change control forms are kept around forever with dates and identifiers so that someone could find out who approved a change. In many cases, these are also printed out, resulting in very large binders of paper with signatures for every change.

4. In an agile project, one of the objectives is to flatten the team and reduce hierarchies so that people can more effectively communicate. However, traditional change control processes require specialized knowledge, special powers of approval and a hierarchical command and control structure. Project Managers are usually the writers of change control forms, but then they must get approval from "Stakeholders" who will bless the change.

Here is a good example of a traditional Change Control process - have a look at Bell South's Change Control Process Guide. At 120 pages, it is a great example of how bloated a large formal change control process can get when Project Managers are working in a bureaucratic environment. Just managing the process documentation alone takes a massive investment - just look at the 20 pages of version numbers of this document and you'll see that someone's full-time job must be simply keeping the guide up to date!

Change Control isn't a bad thing - the original objectives behind formal Change Control are actually in line with the objectives of agile methodologies:

1. Define change and anticipate change early instead of leaving it to the end.
2. Providing a process for incorporating change during development of a project.
3. Communicate scope, risks and impacts of a change.
4. Provide the appropriate review and approval process to authorize a change.

It isn't that change control is bad - it's that the evolution of formal project methodologies has led to very bureaucratic, documentation heavy processes. In addition, keep in mind that most of these processes were invented before the incorporation of digital collaboration tools such as email, Wikis, sharepoint, JIRA, Word, etc. and so the typical change control process has artifacts from a non-digital era.

Implementing an Agile Change Control Process

Change Control can be used effectively in an Agile environment if it is sufficiently light weight, non-bureaucratic and collaborative. Here are my recommendations based on what I have seen work effectively on Agile and non-Agile projects:

1. Use an agile methodology such as XP, Crystal, Scrum, etc. that has change management built into its fundamental process. In Scrum, for example, all work is effectively a change and is logged as a "change request" in a work backlog. In XP the changes are logged as User Stories. Iterations allow for changes to happen on a regular basis - they're not special change events.

2. Use a generic task tracking system such as JIRA to log any change. In JIRA, you don't need a separate "bug tracking" system that is different than your change tracking system. In addition, you can take a change all the way from requirements to deployment without re-entering information. You could do the same thing with low tech tools such as Excel or Word simply by having a work log that is updated regularly.

3. If you have specific legal or regulatory reasons to track changes then try to understand the specific minimum requirements. I've worked in a government environment for example where all changes needed to be documented so that they could be audited. But the level of detail that was incorporated into each Change Control form became ridiculous - an auditor probably doesn't really need to see a change in an individual SQL script, a deployment checklist that includes changing ODBC connection strings, etc.!

4. Eliminate as many approvals as possible. We had a change control form that had 10 signatures on it - I was one of them! I used to get these forms across my desk documenting some change to an application that I had never even seen, had no idea how to measure the risk of the change and yet I was expected to "approve" it. Even worse, the signature had to be on paper so there was a constant stream of people running around with pieces of paper trying to find me to get my signature. Eliminate all this process and identify the minimum number of people who need to be involved in any change.

5. If you're going to have a Change Control Form/Process, keep in as light as possible. Your form should be no more than 2 pages and should be as automated as possible. We currently use JIRA to automate all our tickets. In previous environments, we've used Outlook forms. I've also seen this done use Word with Macros enabled to provide drop downs, automatic fill-in, etc. Keep your process light as well - if you need 2 hours of training to teach someone how to make a code change, then something is wrong!

6. Keep Operations teams involved from day one. One of the primary reasons why change control forms are deployed is because Operations teams get tired of having code dumped on them without documentation or involvement. The typical solution is to put in a gate keeping process to keep the developers from deploying something unsafe to production. This is a legitimate role, but change control processes typically provide artificial security - simply because a developer has filled in the proper form doesn't mean their code works as advertised. Instead, have an Operations Lead that is an integral part of the project from day one who will have a specific understanding of the project and create the right level of documentation, deployment guides, test cases, etc. and be testing these along the way. This is far more effective than a large form being written at the end of the cycle.

7. Keep stakeholders involved throughout the project. The reason why Change Control forms need to be so heavily documented is because the key stakeholders have not been involved all along the way. If stakeholders are seeing working software using Show and Tell techniques, then Change Control simply becomes regular involvement in the project.

8. Use multiple models of communication. Instead of having a single Change Control Form that forces people to write in a specific way, allow for multiple models of communication that could include meetings, power point presentations, white boards, Visio diagrams, etc.

Based on the above principles, here is my current favorite flavour of Change Control:

1. We build our requirements using use case documents that living documents. We currently use Word because its dumb simple and stakeholders can easily open it and change it. We use power point for wire frames and Visio for almost everything else.

2. Revisions of documents get stored in source code control for safe keeping and history. However, we're not dogmatic about it and in my experience the value of these minor revisions is usually not significant - most stakeholders want to see the current version. We keep them in our repository so that everything is stored together and document revisions are tied to code revisions.

3. We have iterations every 2 weeks that include review meetings with the entire team including stakeholders. We do a show and tell of all working code and we use the meeting to prioritize and change. We typically do this by opening up documents on the spot, but sometimes we use pen and paper and transcribe the changes right after the meeting.

4. We use JIRA for day to day tracking of tasks. We treat all changes, bugs, feature requests and tickets the same way. We have a very simple work flow that moves all tasks from open to resolved to closed. Our list of changes can be pulled directly from JIRA as a list of changes. The list of outstanding bugs can be also pulled at any time so we don't need a specific final bug review meeting - we will have been reviewing them on a daily basis.

5. When we're getting close to deployment, we use white board based checklists to capture the minute details (e.g. make sure the ODBC driver is configured properly) that need to be done to move to production. We check these off by simply crossing them off or wiping them from the list. We have 15-20 minute stand-up meetings that includes the Operations Lead so that we're communicating effectively with Operations and they know exactly where things are at as we move into production.

6. Just before doing a deployment to production, I have a meeting with executive stakeholders with a very high level presentation in power point. It presents the current status, any risks that they need to understand, confidence in going, and high level operations plan. Executives typically don't care about whether the SQL is right - they want to know that the team has confidence that it can deploy safely, has followed the appropriate testing processes and that the team is on standby with a contingency plan in case things go wrong.

There are lots of variations to this process and many different tool combinations. You can scale the process up or down depending on the size and formality of the project. In addition, if you're working in a specific regulatory context you may need to be producing more formal documents, approvals, audit trails, etc. My suggestion is always prioritize these below communication and if you need to do this for regulatory purposes then do so but keep the work as minimized as possible. Never substitute change control processes for good communication, team collaboration, stakeholder involvement, etc. In addition, remember that Change Control is a means and not an end - working software is the objective and should be focus for the team.

Sunday, June 24, 2007

Communication of Software Risks

One of the interesting challenges in managing a project is estimating technical risk.

Here is an example of a classic technology risk scenario:

The development team is building an online transaction system that sends orders from an e-commerce system to a warehouse. The e-commerce system is internal, the warehouse is external. The warehouse works on an AS400 system and no one on the team has ever worked with AS400 platforms before. There is a defined web services layer between the two systems which should hopefully hide the workings of the AS400 system behind the layer.

This is a pretty typical high level description of requirements from a manager, a request for proposal, or an email.

Most developers look at this and start analyzing all the things that could go wrong...there are dozens of risks just in this one paragraph.

A project manager might realize that there are some risks involved and if the PM has a technical background might be starting to ask some risk based questions that show some understanding of the potential problems. The worst case scenario is a non-technical PM who thinks that this project is the equivalent of ordering pizza from Domino's - you simply call and expect the order delivered by the guaranteed delivery window.

Let's assume that the entire team is on the ball, everyone's working together and the team comes together to review the project plan. A risk matrix gets created and the team comes up with the following risks:

Risk: Web Service might not work
Probability: Medium
Impact: High

Risk: AS400 might have performance problems
Probability: Medium
Impact: Medium

Risk: Transactions might not work across the two distributed systems.
Probably: High
Impact: Low/Medium

and so on....

This is the critical point where there is a massive communication gap between what a typical PM thinks a risk impact is and what a developer think of a risk impact.

A PM may think, "Well we have some risks so we should allocated some contingency in the budget. This is a high risk project, so we'll add in 30% contingency to our estimate and a month onto the time line."

A Developer may think: "If this server cannot move data fast enough, we're dead in the water. It won't matter how much time or money you throw at it because short of hauling out the entire AS400 out the warehouse we're toast."

Big difference in risk!

I've seen projects where there were mature team members and did all the traditional risk analysis that is recommended on software projects. But the project still failed because there were fundamental differences in assumptions in what "High Risk" actually meant to cost, time line and project success.

Here are some common reasons why there are differences in assumptions around risks.

1. Team members don't all have the same assumptions on impact of a risk. For example, a task is estimated at 3 days but the impact of the risk is "High". So what does that mean to the estimate? Add 10%? Add 50%? What about 10X? In my experience, project managers in particular do not understand the sheer magnitude of software risks - they'll see a risk as "High" and put in contingency of an additional 30% and think they're good to go.

A 10X risk impact is not unheard of - I've seen it myself on many projects. We had one project where one web service call was supposed to take 3 days and took 30 days because of technical complications.

2. There are some risks that result in project failure because in some cases requirements are not variable. For example, financial data cannot be more or less correct - its either right or its wrong. So getting to 80% right isn't really valuable - if you cannot hit the 100% mark then your software project fails. So if you have a risk that the data isn't going to be right then it isn't so much that your project went over budget or took too long to deliver - its a total failure because it cannot meet the basic requirements. Same thing with external software dependencies - for example we had a case where we were integrating with a web services framework and there was a bug in one of the supplied web services from the vendor. It wasn't a matter of "let's just find a work around" - the project was effectively dead in the water until that bug was solved.

Project managers tend to be solution oriented and optimistic, so while they like the idea of contingency, they tend to shy away from the concept that a risk might actually kill their project with no way to get around it.

3. The "I don't know" estimate will get quantified too early on in the process or not be listened to at all. If your team is saying, "I don't know" as a project manager, what is your approach? Many PMs are forced into providing estimates too early by management, so they simply fudge the "I don't know" into a contingency or pad the estimate. They think that by taking the developer's estimate and doubling it they've been given themselves a massive breathing space to worry about the problem later.

The cone of uncertainty on typical projects is a lot bigger than most PMs realize - Steve McConnell's work on estimation pegs the variance at 1600%!



If the team doesn't have a common understanding of how to quantify the impact of risks, then everyone can be communicating using a traditional risk process but the shared understanding of the impact of any risk will tend to be different.

Here are some recommendations for Project Managers for creating an improved risk communication culture:

1. Vary the risk based on expected uncertainty level and the phase of the project. For example, if you're in the planning phase the expected uncertainty level is high. If someone on the team says, "Well we don't really know how that's going to work but we have a plan" that's probably OK. If you hear the same thing in the middle of QA, then you should be very concerned and adjust accordingly.

2. Have the team translated risks from labels ("High", "Medium", "Low") to numbers where possible. In addition, don't assume that one set of labels means the same across the project. For example, a "High Risk" HTML issue might be something very different than a "High Risk" web services integration issue or performance issue.

3. Identify the requirements that are absolute and unmovable and pay particular attention to risks that are around them. For example, in some cases performance is an absolute requirement (e.g. it must serve 30 pages per second) and sometimes it isn't (it must be "fast"). If your requirements are absolute then any risk that hits those requirements will not just cause a delay, an increase in cost, etc. - it will kill your project.

4. Pay close attention to areas of the project where there is limited flexibility or options. Compare the flexibility of a creative front end vs. a bought software system. If someone doesn't like the the front-end, you can rebuild it, change it, etc. It might cost more, create a time impact, etc. but you've got lots of flexibility for change. If you buy Microsoft Content Management Server and it has a bug in it your options are pretty limited.

5. "I don't know" must be a viable option in any discussion. In addition, the response to "I don't know" should be to go find out - be careful about arbitrary padding of estimates simply to factor it into your plan.

6. Pay close attention to body language, talent and historical experience. Relationships matter in software teams and a team that has worked together before has the advantage that the PM starts to recognize the subtleties of individual communication styles and to understand how each person reacts to different questions or risks. Is John an optimist or a pessimist? When someone says, "I don't know" are they being cagey or honest? Teams who have worked together start to intuitive find out these non-verbal cues.

7. Review risks on a regular basis so that you can refine your strategies to mitigate them.

Hopefully that helps you in creating a more pro-active risk based approach and to be aware that just because people the team are calling somet "high risk" they may not actually mean the same thing.

Thursday, June 21, 2007

Developer Weasel Words

As a development manager or project manager, you here a lot of weasel words and excuses from your staff or from external consultants who are trying to hose you into believing things are better than they are. In many cases, developers use these phrases to even convince themselves that things are better than they are, resulting in chronic late delivery and poor quality.

So beware the following phrases from your teams:
  • It should work: this usually means that it doesn't. It also means that it was probably not tested properly as the result is current undetermined. The word "should" should be taken out every developer's vocabulary - it either does or it doesn't.
  • I just need: beware of that word "just". Its a belittling word meant to make things smaller than they are. Just take the phrase "I just need to write this component" to be "I need to write this component" and already the magnitude of the work involved grows. Developers tend to be chronic under-estimators and the use of the word "just" is a sign of that mentality.
  • Almost done: this is also a weasel word. When a developer tells you things are "almost done" ask for the specific tasks that are left over immediately. In addition, keep in mind that projects do not progress linearly - the last 10% is always about 40-50% of the work of the total project. I've seen projects that are chronically late be "almost done" for 3 months.
  • It was tested: this also usually means it that wasn't tested properly. Ask for a test plan and the specific tests that were done. If the developer cannot produce these with sufficient evidence that PROVES that it was tested, then it wasn't tested.
  • It must be an environment/configuration/deployment problem: this may be actually true, but it usually points to a larger stability problem. If you cannot build and deploy reliably then why would you have confidence that the code works?
  • If things go smoothly: this I hear a lot, e.g. if we don't hit any snags then we can be done by Friday. Guess what - you're likelihood of hitting a "snag" by next Friday is probably high and given the lack of risk based management, the team has probably got no mitigation or contingency strategy. Then next week, you'll hear the next phrase in our list, "Yes, it could have been done if it weren't for that Snag we had".
  • Yes, but, as in "Yes it can be done, but": this means it cannot be done. Tell your staff to just come clean and say, "No it cannot be done". Another variant on this is, "Yes it could have been done, if it weren't for marketing, requirements, technical risk, etc." This simply shows that your developers work in an idealistic world where things never go wrong.
  • We'll make up the time at the end: if you're already late by the end of requirements, you're likely going to be even later by the end if you simply keep going on the same track. In my experience, teams don't dramatically faster as they hit their stride. Even if there is some efficiency, its nowhere enough to make up for lost time.
  • I've got it done, but I need to build a few more components for you to be able to see it: then its not done! Encourage show and tells, code reviews, unit tests, etc. so that code is visible as soon as possible. Use slicing models so that you can see pieces of the application in weeks, not months. In addition, code that isn't checked in should never be counted - that means that someone cannot build it sufficiently to share it. It only counts if you can verify it. Ideally, its not "done" unless there are sufficient unit tests, a build script, and a document that someone walking into the code repository could check out the project run a build and have all the unit tests pass. Then the code is done - anything less is mythical.
  • I've got it done - I just need to integrate it: The word "Integrate" is a big weasel word. Think of a web service that adds two numbers together. The algorithm is one line of code. But the integration work is huge. In addition, integration usually means the first time that disparate teams are bringing code together which is always cause for issues. Don't under-estimate the integration, especially in today's world of distributing computing, web services, etc.
  • It Worked on my Machine!: programmers use this excuse to downplay a bug. The reality is actually the opposite - it means that you have an intermittent bug which is by far the worst kind of bug to have in your application. You want bugs to fail quickly and consistently - any variant such as "That's Weird", "That didn't happen yesterday", "That must be a data problem", etc. is admitting you have a bug that cannot be easily duplicated.

My recommendations to reduce the amount of excuse making from your team:

  • Encourage a culture of honesty and team work: You get these excuses when developers are hiding things, and sometimes this is because you've created a culture that encourages hiding because you don't want an honest answer.
  • Be ruthless with your quality and talent standards: don't excuse poor talent, bad management or chronic late delivery. If you create a culture where talent isn't rewarded the bar isn't kept high then you'll be excusing the team to continually strive for excellence.
  • Expect more than just code: measure performance based on estimation, quality, delivery and team work as well as pure code quality. If you have a developer who produces great code but cannot deliver on time then that's not a great developer.
  • Increase visibility and shrink delivery cycles: if you have to show your work on a constant basis and deliver on 2 week iteration cycles, your excuses tend to go away. You either deliver or you get found out pretty quickly. Use show and tells, code reviews and continuous integration to see what people are doing on a constant basis.
  • Don't give half credit for 50% done - its either done or not done: If your tasks cannot be managed this way, then you should split up your tasks until you can work this way.
  • Establish what "Done" really means: for example, at a minimum "Done" should mean checked into source code control and able to build into the current branch. If you're doing Test Driven Development, it should also mean all tests run successfully. If you have specific performance criteria, then its not "Done" until the performance tests pass.
  • Use counting techniques to measure wherever possible: this is a great suggestion from McConnell's book on estimation. The more you can count in units, the more accurate you estimation. So if you can count the number of pages, web services, objects, databases, tables, stored procedures, tasks, etc. that are left to accomplish then you can measure them more easily than if its a big blob of work. If your requirements aren't well defined enough to count objects, e.g. you don't know how many web pages you're building in your web site, then you're really not in a position to estimate your ship date.
  • Don't sucker, manipulate or bully your team: If as a project manager, you resort to traditional management tactics such as playing games, being political, establishing a blame culture, or bullying your team you'll lose your credibility and simply encourage lying. A tortured prisoner will tell you anything you want to hear - the same goes with development teams.

If you have a project that operates in the open, has a culture of honesty and establishes a high performance bar, you'll find that peer pressure as well as some overall guidance will get risks, problems and bugs out in the open. If when you discover these problems people work as a team to fix them instead of blaming each other then every problem solved becomes a victory and not a blame opportunity. You'll get better answers and improved morale on the team as you set clearer performance expectations.

Thursday, June 7, 2007

Low Tech Approaches to Requirements Gathering - Part 2

For those who missed Part 1, I wrote on how to use low tech tools such as paper, Post-IT Notes, whiteboards, etc. to gather requirements.

In this post, I'll describe how to better use tools such as Office, Project, Visio, etc. to gather requirements.

Here are my recommendations about approaching tools such as these in an agile context:

1. Use "Just Enough" tools. Don't use Rational Rose for UML diagramming if Visio will do quite nicely.

2. Buy the absolutely best tools for the job. In theory, you can write .NET applications using Notepad and command lines tools and save a few bucks on licenses. But the productivity will be poor and learning curve will be worse. Don't allow your organization to scrimp on tool costs - in my experience if its the right tool for job, paying the $500-1000 for a particular tool is worth the cost.

3. Invest in tools that are standardized. If you're working in Java, use Eclipse. If you're working in .NET, using Visual Studio. If you're an Oracle DBA, get Toad in your office. If you want a source control tool, get VSS, Subversion or CVS and not Seapine. That way when you go hiring for new developers, they've probably used your tools before.

4. Get really good at using the tools. It sounds like a basic suggestion, but I don't know how many project managers I've worked with don't really understand Microsoft Project. If you set up project in particular ways such as exposing the dependency columns, splitting the window to have the resource allocation on the bottom instead on the side, getting rid of the GANTT chart altogether, etc. productivity goes up considerably. Same thing with Word - the first thing I do with any document sent to me is look at how many Styles are being used and typically I find hundreds of them. Whomever wrote the document didn't understand how styles work, why they improve productivity, etc.

5. Buy tools that are easy to learn. Again, another dumb suggestion but I look for tools that a junior developer or programmer can understand. In many cases, this means buying more tools as the simplest ones can be single purpose. I've rarely come across a monster tool that works as a really good Swiss Army Knife for all occasions. The profiler I use though is stupid simple - its from RedGate and you load it up, point it at your project and start profiling in about 30 seconds. Its dumb simple to learn and cheap as well.

6. Have everyone have access to all the tools and have everyone knowledgeable about them. For example, I've worked in organization where only the Senior Project Managers were "allowed" to have Microsoft Project. If you weren't a Senior PM, then you had to either use Excel or find a Senior Project Manager to help you build a project plan. Technical resources should be able to open up a project plan as well - if you want your team to be accountable for deliverables, telling them that they're not important enough to see the plan sends the wrong message!

7. Automate work as much as possible. Use Continuous Integration, Test Driven Development, build scripts, O/R mapping layers, code generators, documentation generators, etc. where appropriate to automate drudgery work. Invest in time sheet systems, collaboration spaces, source code control systems, etc. where appropriate instead of tracking things manually.

8. Remember that every document, artifact and tool costs money to buy and to maintain. Every software license has maintenance costs. Every document takes up space on a file server. Artifacts have to be managed, secured, backed-up, etc. So travel light as product just enough documentation. Use just enough tools to do the job which also usually means use the ones that are the most productive. Remember that emails are documents as well - if you're finding that you're getting hundreds of emails a day, figure out how to get your team to be more concise, more action oriented and spend the majority of their time producing deliverables instead of documents!

9. Get the fastest computers you can afford. Get two monitors minimum for every developer. Get a good video card. If you have to wait 20 minutes to do a build, trying to do agile development is going to be tough. If paying an extra $500-1000 will cut that build time to 5 minutes then I would pay the money as it will result in massive productivity improvements on a daily basis.

Tuesday, June 5, 2007

Low Tech Approaches to Requirements Gathering: Part 1



One of the tenents of agile development is just enough documentation. I would recommend adding another suggestion: just enough tooling.

The boss comes to you and says, we need a project plan for this large software project. Budget is about $1 million and I need it done in 6 months. Figure out what is required, how many resources you need and what kind of scope can be delivered.

So how many of you have already reached for Microsoft Project?

Forget it for now - come back to it after you've tried some more low tech approaches. Here are some suggestions in order of really low to medium tech approach:

1. Talking: before you start visualizing, diagraming, or white boarding, start talking! Some people talk and diagram at the same time (I do) but I've been to too many meetings where an architect gets up to the front of the room and the team sits there for 30 minutes waiting for the person to finish his fancy whiteboard picture.

2. Piece of paper: I love white boards, but they're hard to carry to a bar, a coffee shop, an airplane, etc. So keep a sketchpad, a napkin, etc. and use it as your white board.



3. White board: the number one tool for an agile PM. If you want to record your white board, take a digital picture of it!

Note: Make your white boards portable. Get the white boards that are on wheels or make them small enough that you can move them from desk to desk. We used to have our release checklist on white boards and it worked great - we could leave it up permanently (without the PLO in a meeting room) and then we would erase things off the board as they got done. This also stops the need for dedicated planning rooms - simply bring the tools with you.



4. Big sheets of paper and Post-IT Notes: Ever done a web site map with a big sheet of paper, some markers and post-it notes? Try it and you'll never go back to using Visio to do site maps again.

Note: If you want to be really advanced, use coloured Post-IT Notes. Get Red, Yellow, Green and you can use them to connote priority, level of difficulty, etc.

5. Paper templates: if you find yourself redrawing, create some templates in word and then print them off. For example, don't draw yourself a calendar each time - simply print off one in outlook and then start writing on it.

All of these techniques mean no use of a computer (except for create a couple templates). You can use these techniques in any environment that has access to an Office Depot.

Low tech approaches to planning, requirements gathering, design, etc. have some specific benefits:

1. No license costs: while this isn't such an issue with Project, if your development tool standard is Rational Rose, Together Soft or some other expensive IDE where every user must fork out thousands to build a UML diagram, a project plan or a document then using lower tech approaches will have dramatic cost savings.

2. Encourage collaboration: if you get people to talk, to collaborate and to physically draw, use construction paper, or write the collaboration happens naturally.

3. Take away bias: If you're a technical architect, you think in objects. If you're a database designer, you think in tables, stored procedures, queries, etc. If you're a project manager, you think in gantt charts, dependencies and resources. So which toolset do you want to work with together? Post-it notes makes everything give up their biases and focus on real requirements.

4. Speed: How fast are you really with Project, Visio, Word, etc. I'm a power-user on all these tools but I still find whiteboards are faster.



5. Freedom to reboot: People get attached to their work. In addition, if you've spent the past 2 hours making sure the lines all connect properly to the boxes in Visio or making sure that you've leveled your resources in Project you really don't want to relive that experience in the same afternoon. But whiteboards are really easy to reboot and people don't get as attached to Post-IT notes.

6. Multiple models: If you use computer based tools, its more difficult to use multiple models. You need Visio for your wireframes, you need Word for some documents, you need Project for your gantt, etc. The amount of tools required to support a multiple-model approach. Alternatively, you get sucked into the idea of using one BIG GRANDIOSE TOOL - enter in the Rational Rose, MDL, Case Tools, Heavy IDEs, etc. that try to be all things to all people and cost a fortune in the process.

One of the challenges with low-tech approaches is how to translate them into digital, cleaned-up format for posterity. Here are some basic suggestions:

1. Don't bother: every document requires upkeep, so don't bother capturing every design decision in a fancy document unless its really necessary. Low-tech documentation is more about the process of thinking through drawing then creating fancy documents. Keep the top 10% of what comes out and dump the rest.

2. Take a picture: take a picture of your white board - you've now got documentation! Put it on your WIKI, store in Word documents with notes, etc. and you're good to go.

3. Data-entry: sometimes you want to capture the notes, diagrams, etc. in a digital file so it can be further manipulated. So at the end of the meeting, take the 20 minutes it requires in most cases to data-enter it using the right tool. Better yet, get your junior or admin assistant to do it for you - why have a $100K technical architect creating circles in Visio when a $40K secretary could do it for you?

Note: this is probably an out-sourcing opportunity as well. Do some white boarding, take a picture and then send it overnight to diagrammed in India. Walk in the next morning with your fancy new diagram complete with colour coding and code stubs created!

Once you've done some design work in a low-tech manner, then use a computer based tool if you need it. See tomorrow for part 2 where I discuss how to use the computer in a low tech way and also how to use the existing tools more efficiently.

Tuesday, April 24, 2007

Classic Presentation from Uncle Bob Martin

I saw Bob Martin at a Software Development conference a couple years ago and loved his presentation. He's one of the founders of the Agile Manifesto and one of the smartest old-school architects in the business.

He's just posted his classic presentation on The Principles of Agile Design. This is a must see for any Technical Architect.

Service Oriented Architecture - "I think we spend way too much on the 'A' and not enough on the 'SO.'"

There is a really neat article in today's CIO.com. The article describes some of the trends in IT over the next few years, and the general argument from Gartner points to a vision of an IT department that is customer focused.

I showed this cartoon to my IT team and described the "traditional" view of IT - this is how a lot of customers see us as IT professionals:



For my entire career, I've been in Information Technology but have never really been a technologist. I can certainly code, architect solutions, but if you pressured me to come up with a fast algorithm I'd be hard pressed to do so. I've never worked with mainframes, punch cards, assembler, or hardware other than my PC.

What I do know how to do and what is increasingly valued in the new vision of Information Technology is to come up with creative technology solutions and I can span from end to end of the technology development life cycle. I can sell solutions, evangelize change and think strategically about a problem and create an applied technology solution.

When I meet young programmers, I actively encourage this type of thinking because as the article points out, this is really the differentiators in my line of business. If you want to make yourself outsourcable, concentrate on algorithms, data, and optimization of technology solutions. If you want to stop being outsourced, start thinking about the solution, the customer and how you can take most of your components from cheap off the components and bring them to life to solve a real business problem. That's how the modern IT department creates value - the rest will be quickly outsourced or commoditized.